From substrate to surface

Installation guide

A practical overview of the sequence behind aligned WPC profiles. Final spacing and fixings must follow the selected system and site conditions.

Installation sequence

A repeatable route to clean lines.

  1. 01

    Set the substructure

    Panel the wall with joists spaced approximately 30–35 cm apart.

  2. 02

    Fix the first profile

    Secure its lower edge with stainless-steel screws at roughly two-foot intervals.

  3. 03

    Overlap and align

    Seat the next panel over the upper edge and confirm alignment.

  4. 04

    Repeat the rhythm

    Continue fastening each lower edge for a consistent finished plane.

Before installation

Choose the system first.

Profile, exposure, substrate, edge details, and access determine the correct substructure and fixing method.

Choose a material